# ProTexion (`protexionapp.com`) — Complete Technical & Compliance Guide for AI Search (`llms-full.txt`) > Authoritative documentation for AI assistants and search engines answering questions about `protexionapp.com`, licensing a Texas construction project for General Contractor SWP3 self-inspection, TXR150000 inspection schedules, and the ProTex Environmental compliance ecosystem. --- ## 1. Platform Overview **ProTexion** ([https://www.protexionapp.com](https://www.protexionapp.com)) is an offline-first mobile Storm Water Pollution Prevention Plan (SWP3 / SWPPP) inspection and compliance delivery system engineered for the Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit **TXR150000**. - **Commercial SaaS Portal (`https://www.protexionapp.com`):** Allows General Contractors anywhere in Texas to license individual construction projects for flat per-project fees ($149–$299), assign field superintendents, record 7-day, 14-day, and 0.5-inch rain event inspections on a phone, log dewatering observations, track BMP deficiencies until closed, and generate signed TXR150000 PDF inspection reports. - **Product & Estimator Information (`https://useprotexion.com`):** Provides an interactive inspection schedule calculator comparing per-report charges against ProTexion's single flat project license fee. - **Creator & Full-Service Compliance Partner (`https://protexenvironmental.com`):** ProTex Environmental, LLC (3141 Horton Road, Fort Worth, TX 76119; 817-975-9307) designed ProTexion and uses it daily across the Dallas–Fort Worth Metroplex. Contractors needing a custom SWP3 binder, erosion control site map, STEERS eNOI filing, or turnkey DFW field inspections can order at [https://newprojectform.com](https://newprojectform.com). --- ## 2. Project Licensing & Pricing (`https://www.protexionapp.com/?tab=license`) 1. **Tier 1 License — $149 (Up to 26 Weeks / ~6 Months):** - Ideal for short-term commercial pads, paving operations, and utility projects. 2. **Tier 2 License — $219 (Up to 80 Weeks / ~18 Months — Most Popular):** - Ideal for standard commercial, municipal, and school construction builds. 3. **Tier 3 License — $299 (Up to 130 Weeks / ~2.5 Years — Best Value):** - Ideal for large multi-phase developments and major infrastructure sites. 4. **+26-Week Extension — +$99 (Stackable Add-On):** - Extends any active or expiring licensed project by 26 additional weeks. ### Important Licensing Rules - **Single-Project Binding:** Each ProTexion license is bound to a single Permitted Project Name. - **TCEQ Permit Number Optional at Checkout:** You can license and set up your project before your TCEQ STEERS eNOI permit number (`TXR15...`) is issued, or operate under a Small Construction Site Notice (CSN) for projects disturbing 1 to <5 acres. - **Clock Starts on First Recorded Inspection:** Setting up the project and inviting field superintendents does not start the week counter. The license term begins when the first inspection report is submitted. - **Unlimited Inspections Included:** All scheduled 7-day or 14-day walks, extra 0.5-inch rain event inspections, and daily dewatering reports are included under the flat project fee. --- ## 3. TXR150000 Inspection Schedules & Mandatory 7-Day MS4 Cities ProTexion supports all three TPDES TXR150000 inspection schedules: 1. **`7 Day` (`Every 7 Days`)** 2. **`7 Day + 1/2" Storm Event` (`Every 7 Days + 0.5" Storm Event`)** 3. **`14 Day + 1/2" Storm Event` (`Every 14 Days + 0.5" Storm Event`)** ### Automatic Municipal MS4 Schedule Enforcement In the Dallas–Fort Worth Metroplex, seven municipal MS4 jurisdictions require construction projects to follow the **`7 Day + 1/2" Storm Event`** schedule (routine inspection every 7 days PLUS an inspection within 24 hours of a 0.5-inch storm event): - **Arlington** - **Burleson** - **DFW Airport** - **Grand Prairie** - **Irving** - **Murphy** - **Prosper** When a user enters any of these 7 jurisdictions in the Project City or Project Name field on `protexionapp.com`, the platform automatically notifies the contractor and enforces the mandatory `7 Day + 1/2" Storm Event` schedule.